UPDATE APRIL 2014
A replacement bridge near the ditch which feeds the Balancing Pond is planned and the oak to make a new one will soon be milled from the logs currently stacked outside the barn near the Boat Shed. This new bridge is planned to be built in a joint task by John Armitage and the Nonsuch Voles this summer.